Siirry sisältöön

Logistics

All you need for your company logistics is right here in Southern Finland

The location of the Kapuli Business Park in Mäntsälä, Southern Finland, is tailor-made for the logistical needs of a company: Mäntsälä is connected to major cities through highways, a nearby airport, and ports. An ideal logistic location for your company!

By investing in Mäntsälä, you'll have access to valuable highway connections: The Nelostie highway (E75) takes you to Lahti in 35 minutes, and the capital city of Finland Helsinki is just 40 minutes away. The ring road V will have you in Porvoo in 35 minutes and Hyvinkää in 20 minutes.

Location and main logistical distances to Mäntsälä.

In Southern Finland Mäntsälä, you'll have an easy access to all the major highways, to the airport and main ports of Southern Finland.

The Kapuli-Mäntsälä Business Area offers ease of export, import, and transportation

There are multiple ways to do maritime transport from Mäntsälä: The port of Vuosaari is only 40 minutes away, Kotka-Hamina 90 minutes away, and the port of Hanko is two hours and 15 minutes away.

Finally, the Helsinki-Vantaa airport is only 40 minutes away from Mäntsälä by road. Furthermore, a recently built railroad connection will get you to the airport even faster.

Size is no issue for the Kapuli Business Park. The business park has been expanded several times and one expansion is currently underway.

Tokmanni, Global DC, Ball and Comforta - amongst many others - have already invested in Mäntsälä. Contact us – We are ready! 

The location gives us a clear competitive advantage and the opportunity to cut the carbon footprint from transportation.

Mika Purhonen, Recticel Insulation Oy

Responsible heating solutions

Excess heat to use with Global DC  

The local energy company Nivos has launched a heat recovery plant and the heat transfer to the district heating network. The heat recovery is carried out in cooperation with Global DC data center. Global DC data parlors generate heat, which is collected and directed along the district heating network to the Mäntsälä households. Initially, the waste heat can be collected corresponding to the heating amount around a thousand houses. In this scale the project is the first one in the world.

Due to the collected waste heat, carbon dioxide emissions are reduced by up to 40% in Nivos district heating. This is a significant achievement, as the emission reduction in district heating corresponds to the objective EU set for emission reductions in 2030. Heat recycling increases sustainability and in the long-term will also improve the competitiveness of district heating.  

Nivos bioenergy plant

The fully automated and unmanned plant has four boilers and a storage tank. The plant's production covers about one third of the energy of the district heating network in the centre of Mäntsälä. The fossil-free heat it produces reduces the carbon dioxide emissions of district heating produced by Nivos by up to 2500 tonnes per year.

Benefits of locating your business to Mäntsälä

Mäntsälä has wide services for you to establish and run your business and it’s an attractive neighbourhood to live in. Also the favorable legislation to store and handle information has led many data center operators to establish business in Finland. The Government of Finland still intends to hold on firmly to this leading position in the world of digitalization and framework necessary for growth of this digital industry will be sustained also in the future.

States that have adopted strict legislation on data protection generally tend to be more favorable to the placement of datacenters than states without or lacking sufficient legal framework of data sovereignty. The legislative environment of Finland is quite different even from the other Nordic countries. In Finland the right of privacy of any communication is a basic right that is inviolable and there is a strong legal protection over governmental surveillance of digital information.

See available plots or find out more about Kapuli:

Energy

The local energy supplier Nivos has three 110kV power transmission lines directly from the Hikiä generating plant to the substation at Kapuli Business Park, which improve the dependability of electric power supplies to data centers in the Kapuli area. Currently Kapuli is served by three independent 110 kV power lines from two separate connection points on the national grid. The outgoing transmission line connection at Hikiä has also been duplicated to supply two separate substations. Each of the three 110 kV transmission lines is capable of supplying about 100 MW of electric power to Mäntsälä.

The 110kV Regional Grid

There is no minimum connection limit for the Nivos 110 kV regional network, so a new operating point starting at low peak power may be connected to the regional network by bilateral agreement. This gives you flexibility in timing investments, and the freedom to develop your operations without the constraints of a connection limit.

Illustration of the three 110 kW transmission lines to Kapuli Mäntsälä.

Fresh water & customized cooling options

Local water company Nivos Vesi Oy supplies fresh water and sewerage on the Kapuli site.

  • District cooling, customized district cooling to the district heating on the site.
  • Excess heat from cooling is transmitted for heating houses in Mäntsälä.
  • Cool climate, average temperature is 4.6 °C, 17 days over 25 °C.
  • Wind conditions for air-cooling solutions.
  • Natural gas option on the site. (The service provider is Auris)

Metallisesta L-muotoisesta putkesta tulee vettä. Taustalla on Nivoksen brändi-ilmeellä teipattu pakettiauto.

Fast and assured data connections & broadband services

Kapuli Business Park enjoys fast, high capacity, assured data connections to the main Finnish Internet hub (FICIX). Your data center is guaranteed to have fast and safe connections.

There are several operators using fibre optic connections in Mäntsälä:

  • Cinia Oy
  • FNE-Finland Oy
  • Elisa Oyj
  • DNA Oyj
  • Telia Finland Oyj.

They all have fiber optic network in Mäntsälä and enough network capacity is available or can be built according to an order.

The Cinia C-Lion1 submarine data cable offers the shortest and fastest route to connect Central Europe with optimal data center locations in Northern Europe and business opportunities in Eastern Europe and Asia.

The Nivos expert is in a dark room with fibre optic wiring. The equipment gives off a bluish light in the room.

For more information, visit the Traficom website. (The link will open in a new window)

Network coverage and services in Finland

  • 10,000 km fiber routes
  • NGN DWDM, SDH, Ethernet
  • IP core network MPLS
  • Dedicated IP networks
  • Several co-locations
  • Gateway locations to Russia
  • Telematic systems.

 Map about availability of fixed network in FInland and fibre-optic network by province in Finland. You can see that in Mäntsälä about 20% of households have fibre optic network and in some places its speed is up to 1000 Mbit/s (DL)

Image source: the Finnish Transport and Communications Agency

No major hazards -Stable environment for data centers

In Finland, there are little or none natural risks:

  • No floods area
  • No hurricanes, tornados
  • No volcanos
  • No earthquakes.

No hazards from neighboring activities:

  • Data center (Global DC)
  • Warehouses (Tokmanni).

The stable environment illustration shows that there are no floods, volcanoes, hurricanes, tornadoes or serious earthquakes in Finland.

Plot planning & building quota

Site and building quota

Site area is approx. 1 - 10 hectares. Construction right is 30-60%, depending on the plot.

Shape and topography:

  • The Kapuli business district has been expanded several times. The soil of the ready-to-build plots is broken stone and moraine. The new Kapuli V area is currently being planned/zoned. The land is in its natural state and will require leveling.

A water pipe and a sewer have already been constructed reaching the border of the ready to build lots, and there is also a natural gas pipeline nearby.

Moreover, district heating is available from the neighbors.

Planning and permitting

Zoning and readiness for construction: Detailed city planning is in progress.

Permits: Ordinary building permits, other permits depend on the activities and are regulated by mostly environmental laws

Guidelines for construction project permit procedure (pdf)

See available plots

Tokmannin pääkonttorin katolta kuvattu Tokmannin rakennustyömaalle  2022. Harmaa-punainen hallirakennus näkyy syksyisen puuston keskellä

The new logistics centre of Tokmanni under construction in Mäntsälä

Employment in Finland

Accident and Pension Insurance

The employer has a statutory obligation to take out accident and pension insurance for the employees; the employees are also provided with group life assurance and unemployment insurance in connection with the statutory accident insurance. The employer must arrange for statutory occupational health care.

Tax and Social Security

The employer is responsible for paying any withheld taxes and social security contributions to the tax authorities, and for submitting annual notifications to the tax authorities, and the pension and accident insurance companies, with information on the wages and salaries paid to employees.

Terms and Conditions of Employment

Working hours.

Regular working hours are usually at most 8 daily hours and 40 weekly hours. In a two week period the working hours are not more than 80 hours and in a three week period 120 hours. The weekly hours may also be arranged in longer periods during which the average weekly hours do not exceed 40 hours. Working hours may be arranged by law or collective agreements alternatively, for example in two- or three-week periods.

Holidays.

An employee has a right to receive pay also for the time he/she is on annual holiday. Normally holiday leave accumulates 2 days (when employment has lasted less than 1 year) or 2 1/2 days for each holiday credit month. Normal wages are paid for the time an employee is on holiday.

Sick pay.

According to the law, an employee who is unable to work due to an illness or an accident is entitled to paid sick leave. Wages are paid for the day when the illness started and for the working days. If the employment relationship at the start of the disability has lasted for at least one month, the employee will be paid full wages for the said period. If the employment relationship has lasted for a period shorter than one month, half of the wages will be paid for the same period.

Family leave.

The family leave laws have changed since August 2022. In Finland you are entitled to the pregnancy leave, parental leave, and child-care leave.
The pregnancy leave lasts for 40 working days. It usually begins 30 weekdays before the child’s due date and must be started at least 14 weekdays before the due date. The parental leave lasts for 320 working days and both parents are entitled to 160 working days’ leave, one parent at a time. Parents can take 18 working days of parental leave or pregnancy and parental leave at the same time. After the parental leave you can take the child-care leave.
You can apply allowance for family leaves from Kela (The Social Insurance Institution of Finland) https://www.kela.fi/families. (The link opens in a new window)

Establishment support: answers to your location-related inquiries

The photo shows Irina Patrikainen and Juha Leinonen with their backs to each other.

Contact us - We are ready

Investing in Finland

Contact Us - We Are Ready

Mr. Juha Leinonen
+358 40 176 8712
This email address is being protected from spambots. You need JavaScript enabled to view it.

Please let us know your name.

Please state the name of the company you represent.

It will be easier for us to contact you if we have your email address.

Please give the phone number we can use to contact you.

Please leave us a message. Cyrillic letters are not accepted.